Turnkey B2B Solutions.
We provide the land, the facilities, and the management. You focus on the product. Plug-and-Play cultivation spaces available for lease and profit-sharing models.
A 10-Acre Light Industrial Campus engineered for absolute energy independence, scalability, and operational excellence in California City.
We provide the land, the facilities, and the management. You focus on the product. Plug-and-Play cultivation spaces available for lease and profit-sharing models.
Dual-redundancy energy infrastructure: LNG micro-turbines plus an approved SCE grid connection. Never worry about blackouts.
Built to the highest standards, integrating advanced water recycling and strict environmental compliance.
A phased build-out designed around one principle: every square foot should be productive from day one.
Completed, ready for build-out and operations.
Master plan includes 26 lots — 25 warehouse facilities plus one office building, custom-designed to meet commercial agricultural demands. The LNG yard occupies a temporary 2–3 lot footprint and is designed for later removal.
On-site LNG generation designed to deliver stable, off-grid electricity for Phase 1. Concrete pads are complete; equipment installation follows permit approval. The yard sits on a temporary 2–3 lot footprint and can be removed once SCE service is live.
Edison's underground line extension to the site is approved for construction (SCE Project 3182246). Primary and secondary conduit routes are fully engineered; civil work precedes cable pulls, transformer installation and metering.
Advanced closed-loop water recycling systems to ensure sustainable operations in the California desert.
Dual-path power. If one source fails, the campus keeps running.
Request the technical brief
Financial models, lease performance, and construction progress are shared with qualified investors under NDA.
Password Protected Area. Please enter your credentials to view financial dashboards and real-time construction updates.
Access is limited to accredited investors and project partners. Contact IR for credentials.
Yes. The site is connected to City of California City municipal water, and the connection is live.
Once the on-site LNG generation is commissioned, we project power in the region of $0.30 per kWh. The final figure depends on the completed installation and is confirmed at lease.
Yes. Ten warehouse pads are already graded and ready, and construction on additional buildings can begin as soon as a lease is signed.
Three to five years and upward, with renewal options negotiable.
Cost and occupancy figures are indicative and confirmed only in a signed lease.
Tours are by appointment only. Use the form to request a walkthrough.